Project Scope

  • Removal of 400 T8 fluorescent fittings and installing 336 LED Panels
  • Upgrading the emergency lighting to LED based self-test emergency lighting
  • Reconfiguration of the activity hall’s lighting layout to meet current needs
  • Verification of savings via before and after energy measurement

Outcomes

  • 75% Reduction in lighting energy consumption
  • 4.2 years Return of Investment period
  • £8,000 per year savings
  • 36 tonnes eCO2t reduction
  • 5 year warranty on the fittings