Maintained Primary School LED Lighting
Holy Trinity CoE Primary School, Guildford
Organisation Type CoE Pimary School Building Type Double story school facility
Project Scope
- Removal of 400 T8 fluorescent fittings and installing 336 LED Panels
- Upgrading the emergency lighting to LED based self-test emergency lighting
- Reconfiguration of the activity hall’s lighting layout to meet current needs
- Verification of savings via before and after energy measurement
Outcomes
- 75% Reduction in lighting energy consumption
- 4.2 years Return of Investment period
- £8,000 per year savings
- 36 tonnes eCO2t reduction
- 5 year warranty on the fittings